Answer

A new temporary entrance will open in the service yard towards the bottom of Chester Road from Monday 9 January 2023. This will allow access to the Library@Murray which is located on the lower level of the Murray Building.

Construction work will begin on the new Medical School and Psychology teaching spaces within the Murray Building on Monday 9 January 2023. Building work is due to complete by September 2023.

During construction, the Library@Murray, which is on the lower level of the Murray Building, will remain open.
 

library and lecture theatre temporary entrances